Calculates safety stock and the reorder point (ROP) from daily demand, demand variability, lead time and service level.
Things to keep in mind:
- The normal-demand assumption may not suit erratic or intermittent demand.
- Compute the standard deviation from real history; guessed values mis-size safety stock.
- Seasonality, promotions and order quantity (EOQ) are not modelled.
- Service level is limited to the five listed values.
Calculator
Result
Enter the values and press Calculate to see the result here.
About this tool
The reorder point (ROP) is the stock level at which a new order should be placed. Safety stock is the extra inventory held against demand and lead-time uncertainty.
Formulas
- Lead-time demand = d × L
- Lead-time demand std dev σ_LT = √(L × σ_d² + d² × σ_L²)
- Safety stock = z × σ_LT
- Reorder point = d × L + safety stock
d is average daily demand, σ_d the daily demand standard deviation, L the lead time in days, σ_L the lead-time standard deviation and z the standard-normal value for the service level: 90 % → 1.2816; 95 % → 1.6449; 97.5 % → 1.9600; 99 % → 2.3263; 99.9 % → 3.0902.
Example: d = 50, σ_d = 10, L = 9 days at 95 %: σ_LT = √(9 × 100) = 30; safety stock 1.6449 × 30 = 49.35; ROP = 450 + 49.35 = 499.35, in practice 500 units.
Demand is assumed to be normally distributed and independent from day to day.
How to read the result
Place a new order when stock on hand (including open orders) falls to the reorder point: average demand during the lead time is covered, and the safety stock covers days when demand or lead time turn out worse than expected. Raising the service level from 95% to 99% raises z from 1.6449 to 2.3263, i.e. about 41% more safety stock, so choose the service level by the product's margin and the cost of running out. Use the economic order quantity (EOQ) tool to decide how much to order.
How to use
- Enter average daily demand and its standard deviation.
- Enter lead time and, if known, its standard deviation.
- Select the target service level.
- Press Calculate.
Notes
z values are standard normal quantiles. Safety stock and ROP are rounded HALF_UP to 2 decimals; the "rounded up" output is the ceiling of the unrounded ROP. The service level is a cycle service level (probability of no stock-out per replenishment cycle).
Sources
Frequently asked questions
Extra stock held above expected lead-time demand to protect against higher demand or late deliveries.
A 95 % probability of not stocking out in one replenishment cycle; higher levels raise safety stock quickly.
Take the standard deviation of your historical daily sales (STDEV in spreadsheets).
Supplier delays add risk independent of demand variation; the two combine as √(L σ_d² + d² σ_L²).
Next step
Related tools to continue your calculation.
- Calculate
Economic Order Quantity (EOQ) Calculator
Calculates the order size that minimises total inventory cost (EOQ), orders per year and order cycle from annual demand, ordering cost and holding cost.
- Calculate
Turnover Ratios and Cash Conversion Cycle Calculator (Inventory, Receivables, Payables)
Calculates inventory, receivables and payables turnover and their day counts (DIO, DSO, DPO) plus the cash conversion cycle to show how fast working capital turns.
- Calculate
Fixed and Variable Expense Split
Total your costs as fixed and variable and see the fixed cost share. Enter revenue to also get the contribution margin ratio and break-even sales.
- Calculate
Per-Item Cost Including Shipping
Adds product, shipping and packaging cost and divides by item count to give the per-item cost including shipping, plus the share of shipping and packaging in the total.